Attention Buyers/Investors

Be among the very FIRST to preview and PURCHASE a pre-construction condo before it is open to the general public!! Email me - kevinyip@realtyagent.com to join my email distribution list for VIP access to many new real estate developments in GTA (Toronto, Markham, Richmond Hill etc).

Thursday, April 12, 2018

MACKENZIE CREEK -- Major Mackenzie & Markham Rd (Markham)

Mackenzie Creek freehold townhomes project by Macrolink.
Location
- Convenient access to HWY 407 and 404; 
- 2-min drive to Mount Joy Go Station, immediate access to TTC, YRT.
- Within the boundary for Bur Oak Secondary School, Unionville High School, Miliken Mills High School
- Walk Score 90

Capped Levies
Adjusted to $10,000
 
One Time Free Assignment
 
Deposit Structure
5% on signing; 5% at 60 days; 5% at 180 days; balance on closing
 
Non-Resident Deposit Structure
35% on signing; balance on closing.
 
Maintenance
$95/month
 
Occupancy
2019​

Email kevinyip@realtyagent.com for prices

http://www.yippyhomes.com/mackenzie-creek-major-mac--markahm.html  -- for more files to download



Duke Tower (DTK) -- Kitchener, Ontario


DTK is located at Frederick and Duke E in the Business District of downtown Kitchener and it will be the tallest tower in Kitchener.
 
The building will be 33 storeys tall, total 410 suites. There are $10,000 sq.ft of commercial space. It is fully-zoned.
 
One bedrooms starting at $269,000, one bedroom and dens starting at $299,990, two bedrooms starting at $35,000.

Email kevinyip@realtyagent.com for price list and other details. 

 
Location
97 Walk Score, Steps from Ion Rapid Transit System
 
Amenities
24 hr concierge and security; Rooftop terrace with BBQ; Fitness centre; Electric vehicle parking available; Communal Garden Plots; Pet SPA.

Incentives
- $0 Development Charges
- $0 Assignment Charge
- Smart Home Technology Package (smart door, smart lights, smart thermostat)
- One year free property management and lease service (or $2,000 upgrade credit)
 
Deposit Structure
$5,000 on signing; 5% in 30 days; 5% on Feb 1st, 2019; 5% on Nov 1st, 2020.
 
Parking & Locker
Conventional parking: $35,000
Conventional locker: $2,000
Combo electric vehicle parking w/ locker: $45,000
Large locker and parking combo: $39,000
 
Maintenance
$0.43/sq.ft.
 
Occupancy
Summer 2021

http://www.yippyhomes.com/duke-tower-kitchener.html -- for more info

Tuesday, February 13, 2018

Pavilia Towers (Bayview & Hwy 7) -- Tower A & B

Free Special Upgrade Package*
(for Limited Time Only)
**Over $45,000 as Standard**
- One Parking and One Locker Included
- One Time Free Assignment permitted
Assignment must be completed latest 60 days prior to Occupancy
- Plank Laminate throughout except tiled areas – as per Builder’s sample
- Den enclosure with Sliding Door as per plan
- Engineered Quartz Countertops or equivalent from Builder’s selection
with undermount Sink and Double Edge in Kitchen & Washroom(s)
- Electric outlet in main Bathroom as per plan (for heated toilet seat cover)
- Energy Star® compliant Stainless‐steel Appliance package (Range hood, Dishwasher,
Counter‐depth Refrigerator and built‐in smooth top Electric cooktop and wall oven)
- Stainless Steel Microwave with dedicated cabinet shelf
- Extended Upper Kitchen Cabinets
- Under‐cabinet (valance) Lighting in Kitchen
- Soft close Kitchen Cabinet Doors and Drawers
- HST Included
- Capped Levies (Studio/1Br/1+Den $4,000, 2Br & Up $5,500)
- All cheques payable to FRIEDMAN LAW PROFESSIONAL CORPORATION, IN TRUST
(First payment should be paid by Bank Draft or Certified Cheque)
1) $5,000 with Offer 4) 5% in 425 Days
2) Bal to 5% in 30 Days 5) 5% in 540 Days
3) 5% in 120 Days 6) 5% on Occupancy (July 2021)

Email kevinyip@realtyagent.com for more info or go to
http://www.yippyhomes.com/pavilia-towers-bayview--hwy-7.html



Thursday, February 8, 2018

Lumina at Emerald City (Don Mills & Sheppard)


Location spotlight
Close to highways 401 and 404, walking distance to TTC-Don Mills Subway Station and Fairview Mall, schools, restaurants, over 200 shops, local parks.
Scored transit score of 85/100. 
 
Amenities:
Elegrant ground floor lobby with sitting area, mail room and parcel storage, concierge services, gathering lounge etc.

Occupancy Commencing
February 15, 2021
Assignment Fee
$0 Assignment Fee (reduced from $5000)
 
Development Charges and Levies capped
$7000 1B/1B+D/1B+flex
$9000 2B/2B+D/2B+flex
 
Parking
$45,000 per parking space ( for suites 581 sq.ft and above)
Parking Maintenance fee - $52.95/month
 
Locker:
$6,000 per locker
Special Incentive Program:
$6000-$1000=$5000 per locker  ( for suites 603 sq.ft and up)
Locker Maintenance- $21.95/month
 
Special Deposit Structure
$5,000 with signing offer
balance of 5% in 30 days
5% in 150 days
5% in 370 days
5% on Interim Occupancy
 
International deposit Structure 35% total
$5,000 with signing offer
Balance of 5% in 30 days
5% in 90 days
10% in 270 days
10% in 540 days
5% on Interim Occupancy

Contact me kevinyip@realtyagent.com for price list. 




Thursday, January 18, 2018

ERA Condo @ Yonge (Hwy 7 & Yonge) -- Richmond Hill

Deposit Structure: $5,000 on Signing; 5% in 30 Days; 5% in 120 Days; 5% in 425 Days; 5% in 540 Days; 5% on Occupancy
International Deposit Structure: $5,000 on Signing; 10% in 30 Days; 10% in 120 Days; 10% in 425 Days; 5% on Occupancy
Maintenance: $0.54-$0.55 psf. Parking: $32.62/month. Locker: $12.20/month
Parking and Locker Included (Second Parking $35,000)
Tentative Occupancy: As early as January 22, 2018
Capped Levies: $6,000 - 1B/1B+D; $8,000 - 2B/2B+D
Assignment Fee: Reduced to $2,500
Summary of the unit for this project:
- Unit #4- #9 is facing east, Unit #1- #3 and #10-#12 is facing west.
- Site Map is included in dropbox.
- 25-storey, no floor 13.
- Each unit will includes 1 parking and 1 locker.
- To north is YongeParc 2 building (19-storey).
- To northeast is Countyard and YongeParc 1 building (19-storey).
- To southwest across Countyard building is Era 2 (30-story).

Contact me for details -- kevinyip@realtyagent.com

GO to link below for more details 

http://www.yippyhomes.com/era--yonge-condo.html

Wednesday, January 17, 2018

357 King West (King & Blue Jays)

Great Gulf's newest residences. Located at King and Blue Jays Way in Toronto's Entertainment District. A 42- storey, 324-unit tower, pricing starts from the mid $400's.
 
Please note that there is no parking spaces for rent or sale for the whole building. Please also note there this building does not have any balconies.
​Deposit Structure:
​$7500 on signing
Balance to 5% in 30 days
5% in 120 days
5% in 240 days
5% in 540 days
1% on occupancy
 
International Deposit Structure:
$10,000 on signing
Balance to 10% in 30 days
10% in 120 days
10% in 240 days
5% in 540 days
1% on occupancy
 
Development Levies
1 bed/ 1 bed +den $10,800
2 beds $12,800
3 beds $13,800
 
Occupancy
October 2021
 
Contact me for details --kevinyip@realtyagent.com

Monday, January 15, 2018

Saisons West Tower (Concord Park Place) (Leslie & Sheppard)

During the launch the builder will release:
♦ 6th to 15th Floor
1 Bedroom;
1 Bedroom plus Den;
2 Bedroom;
Deposit Structure
5% on Signing; 5% in 120 Days; 5% in 210 Days; 5% in 400 Days; 5% in Interim Closing
International Deposit Structure
10% on Signing; 10% in 120 Days; 10% in 400 Days
Parking
1 Parking is included in all suites
$49,000 for additional parking
Upgrade: EV upgrade $6,000
Locker
1 Locker is included
$6,000
Maintenance Approx $0.58/sqft
Tax Approx 1%
Occupancy Est. Fall 2020

​Contact me for price list