Attention Buyers/Investors

Be among the very FIRST to preview and PURCHASE a pre-construction condo before it is open to the general public!! Email me - kevinyip@realtyagent.com to join my email distribution list for VIP access to many new real estate developments in GTA (Toronto, Markham, Richmond Hill etc).

Tuesday, February 13, 2018

Pavilia Towers (Bayview & Hwy 7) -- Tower A & B

Free Special Upgrade Package*
(for Limited Time Only)
**Over $45,000 as Standard**
- One Parking and One Locker Included
- One Time Free Assignment permitted
Assignment must be completed latest 60 days prior to Occupancy
- Plank Laminate throughout except tiled areas – as per Builder’s sample
- Den enclosure with Sliding Door as per plan
- Engineered Quartz Countertops or equivalent from Builder’s selection
with undermount Sink and Double Edge in Kitchen & Washroom(s)
- Electric outlet in main Bathroom as per plan (for heated toilet seat cover)
- Energy Star® compliant Stainless‐steel Appliance package (Range hood, Dishwasher,
Counter‐depth Refrigerator and built‐in smooth top Electric cooktop and wall oven)
- Stainless Steel Microwave with dedicated cabinet shelf
- Extended Upper Kitchen Cabinets
- Under‐cabinet (valance) Lighting in Kitchen
- Soft close Kitchen Cabinet Doors and Drawers
- HST Included
- Capped Levies (Studio/1Br/1+Den $4,000, 2Br & Up $5,500)
- All cheques payable to FRIEDMAN LAW PROFESSIONAL CORPORATION, IN TRUST
(First payment should be paid by Bank Draft or Certified Cheque)
1) $5,000 with Offer 4) 5% in 425 Days
2) Bal to 5% in 30 Days 5) 5% in 540 Days
3) 5% in 120 Days 6) 5% on Occupancy (July 2021)

Email kevinyip@realtyagent.com for more info or go to
http://www.yippyhomes.com/pavilia-towers-bayview--hwy-7.html



No comments:

Post a Comment